Friday, April 5, 2019
Dust Explosion Is One Of The Major Hazards Engineering Essay
Dust fusillade Is One Of The Major Hazards Engineering EssayDust fusillade mustiness be containled but broker of necessary vent field of transaction form, vas strength, in like manner adjacent comme il faut operating theateral procedures and maintaining good ho intentkeeping. here a new cup of tea alter jell and silo for female genitaliaalile manufacturer is designed. So, as a pencil eraser advisor the vent sizing for a silo is presented to vent a patter fit.Information required for the t solely(prenominal)y of the vent sizing ar strength of the watercraft i.e. silo, blowup properties of the disseminate, size and shape of the watercraft, the placid energizing pressure that is to open the electric discharge in case of any(prenominal) pressure plagia initiate, condition of the dispel cloud.If the splosh is found to be toxic then venting should not be by if theres immediate revile to the environment. But in some un debarable circumstances then the venting is through with(p) with an endangered bea shall be specified. For that safe let go of bea must be calculated to vent the pass around to the atmo area.And perspective of venting is chosen on the top of the silo i.e. vertical venting. This assumption made on the condition that the silo is sited in a congested area. Horizontal venting lead aro intake harm the strength working in the plant area.Plant SketchSilo Air to bag filterPneumatic transporterCyclonePowder penetrationfrom plantAir BlowerVibrating pop outlets to bag weft putsData attached,Silo is of cylindrical shape.Diameter = 10m tip = 30m evince groove space = 15 mSilo Design pressure = 0.25 bargMaterial stored in silo is ductile world power and overly includes Methylene dianiline (MDA).Here the spit is tested in and 20 litre sphere apparatus to find the maximum rate of pressure rise per unit season. The main apparatus is domain of a function volley vessel, clay dispersion system, ignition source, Pressure monitoring system and control system. This test done as per BS EN 14034-2 two hundred6. And it is found that(dp/dt) max = 928 bar.s-1Where (dp/dt) max upper limit rate of pressure (p) rise per unit conviction (t)The objectives of this design arei. To vent the deflagrating that occurs indoors the vesselii. To avoid the injury to personnel by vent acquitiii. To limit the damage of the vesseliv. To limit the damage of the borderingby structuresThe spare-time activity steps are identify for venting sizing with reference toi. Dust deflagration index Kst must be found,Kst = (dp/dt)max * V 1/3Where (dp/dt) max Maximum rate of pressure (p) rise per unit time (t) =928 bar/sAnd volume of the test apparatus is 0.02m3Kst = 928 * (0.02)1/3 bar.m.s-1Kst = 252 bar.m.s-1ii. Now maximum explosion overpressure occurs during dust explosion in an enfold vessel (non- ventilate vessel) Pmax which is to determine the explosive characteristics of the dust. Procedure for measuring Pmax is d one in 5litre apparatus and the apparatus is designed to withstand an native overpressure of 20 bar. First required amount of dust is blastn for the test. Then the dust is dispersed in the vessel at atmospheric pressure and out front that the initial temperature is noted down. Then initial pressure Pi i.e. just a moment earlier ignition is noted. And the pressure rise recorded as a function of time. And from pressure time persuade Pex is determined for the particular dust concentration. And the test is done for various dust concentration and the Pex guides are plot with various dust concentration until the maximum value of Pex is found. And that maximum value is the maximum overpressure Pmax.This Pmax and Kst plays crucial agent in determining the vent size and design for explosion protection. Here dust mixture man is not known, so the vent size is based on spiritedest Kst and Pmax value. The result of Pmax for various dust classes is referred from BS EN 14034-22006, the b ow is shown infraKst (bar.m.s-1)Dust explosion classPmax (bar)0 St 1 9200 St 2 10Kst 300St 3 12 dining put off 1aWhere,St 1- moderate explosibleSt 2 strong explosibleSt 3 very strongly explosible consequently from the fudge above Pmax is interpreted as 10 bar for Kst = 252 bar.m.s-1 and the dust is classified as St 2.iii. Now the vessel design pressure selection must be measured, if the edge vessel is designed as ASTM then Pmawp (Maximum allowable work pressure) wad be calculated. Here it is given that design pressure is 0.25barg.Venting provided should be sufficient to reduce the enclosure vessel rapture overdue to reduced maximum overpressure, Pred,maxHere Pred,max shall be chose shall not exceed two-third of the vessel strength. Venting shall be provided such(prenominal) that Pred,max shall not exceed the vessel strength to prevent the rapture of vessel during venting.Pred,max (Pes/ DLF)Where, DLF dynamic Load actor as a result of pressure rise. In absence of detaile d structural analysis, it is pretended that DLF = 1.5 the design based on weakest structural element.i.e. Pred,max (2/3)(Pes)WherePes enclosure strength in barHence, Pred,max = 0.166 bariv. Vessel Height to diameter ratio, the ratio of height to diameter of the vessel must be included in determining the vent area. Increase in ratio of height to diameter ontogenys the flame propagation inside the vessel. Hence the estimation of the ratio is given below,Veff = r2 hWhere Veff is the volume of the cylindrical vessel were flame groundwork travel along the path.h Height of the cylinderr radius of the cylinderVeff = 3.14 * 5* 5* 30 = 2355m3Aeff = Veff / HWhere Aeff is the effective area of the cylindrical vesselAeff = 2355 / 30 =78.5 m2Deff = ((4*Aeff)/)1/2Where Deff is the effective diameter of the cylindrical vesselDeff=((4*78.5)/3.14)1/2 = 10mH/D = 30/10 = 3mv. Venting cover operation, the following factors to considered for the venting cover operation such as venting opening sh all be free and clear, should be obstructed by weather conditions and any dust deposits. The vent cover shall open at its static energizing over pressure Pstat. And vent cover should withstand the pressure within the static activation overpressure Pstat.. Here venting cover with precise mass And Hence Pstat = 0.2 bar.Sizing of vent area, here the specific situation must be considered for the venting sizing. Here the material is transferred by pneumatic conveyor. And this is classified as Inhomogeneous dust distribution as per New findings on explosion venting by R.Siwek.For vessel length L 10mA = 0.0011 * Kst* H *Df * (1/Dz) (8.6 log Pred,max 6) 5.5* log Pred,max + 3.7 ( 1 +1.715 * Pred,max -1.27 * log (H/D))Where, Df diameter of the pipeline, here its assumed as 0.1m for effective dust reductionA Vent area m2Dz effective diameter of the cylindrical vesselDz =( (4*v)/ ) 1/3 = (( 4*2355)/3.14)1/3 = 14A = 0.0011 * 252 * 30 * 0.1 * (1/14) (8.6 log 0.166 6 ) 5.5 log 0.166 + 3.7 (1 + 1.715 * 0.3 -1.27 * log 3)A = 30 m2Effect of vent ducting, duct is normally to vent the discharge to a safe area a focusing from the work area. But increase in duct length will increase reduced maximum explosion pressure.P red,max = -0.03267 * l*(H/D) + 0.3481 * l0.798Where, l length of the duct (m)P red,max maximum reduced explosion pressure with vent ductP red,max = -0.03267 * 15 * (30/10) + 0.3481 * 150.798P red,max = 1.5 barP red,max = 0.2 *(C1 C2) * (1-(H/D)) + C1Where C1 = P red,max * (1 + 17.3 *(A*V-0.753)1.6 * l) = 1.027C2 = (0.0586 * l) + 1.023 * P red,max0.981 (0.01907 *l) = 0.5P red,max = 0.8 barAnd from the above equation relationship surrounded by the reduced maximum explosion pressure with vent duct and duct length stack be found and withal necessary increase in cylindrical vessel strength throne also be estimated.Since the preparation is still being designed and from the above result of with effect of vent duct it is evident that reduced maximum explosio n pressure increases above the vessel design pressure. So the increase in design pressure and the vessel strength must be re-considered if vent duct is employ to deflagrate the flame.Safe discharge,Maximum flame length for dust,X = Q*V1/3Where Q 8 for vertical dischargeX = 8 * (2355)1/3X = 106.4 mMaximum flame width,W = 1.3 * (10*v)1/3 = 37mMaximum external pressure (dust)P = 0.2 * Pred,max * A0.1 * V0.18 = 0.188 barWhere P maximum external pressureA Vent areaV Volume of the cylindrical vessel.2.This bag filling facility handles malleables mill which generates dust must be examined for the explosive characteristics. For that we need to analyse the chemical compositions in it. The explosive dust decomposes generating large bulky energy. This decomposition includes oxygen in the molecule so it is not necessary that it needs style. So it is essential to screen the chemical composition starting time, if the test indicates the presence of explosive characteristics then necessa ry dust explosion prevention and protection techniques must be enforced as a basis of gumshoe.In launch to prevent the dust explosion following techniques are utilisei. gibeling the source of ignitionii. InertingFor explosion protecting the following techniques are applyi. Explosion containmentii. Explosion suppressioniii. VentingDUST EXPLSION auspicesPREVENTIONControl of ignition containmentSourceSuppressionInertingVentingNow the details of each technique are explained in detail belowControlling the source of ignition, dust explosion cannot occur unless theres a source of ignition. And thereof a careful analysis must be done in design, operation and maintenance for the doable sources of ignition. Here are some of come-at-able sources of ignitiona. hot surfaceb. actuatec. electrostatic instigated. heate. frictionf. flamesFlames are one of the sources which can easily ignite the dust. take project heating i.e. using of burners can be avoided in process where dust genera tion is possible. Welding whole kit and boodle carried on the silo which has possible dust generation inside the vessel. So all hot works carried on silo must be allowed as per the statutory requirements. Any Internal combustion engines near the silo might take in the dust generated nearby and can induce explosion. And hence this combustion engine can be avoided or use of flameproof combustion engines.Electric power is also one of the sources of ignition. Electric spark which are produced from electrical equipment, if comes in contact with dust will result in explosion. Hence all the electrical equipment must be intrinsically safe and also ATEX 137 EU directive 95/9/EC certified equipment should be used depending upon the dust and zone assortment. So this must be done during procurement stage. Once ATEX is implemented then zone classification must be done as a part of ATEX requirement by analysing the possible generation dust from the process i.e. zone 20 dust generation is ofte n, zone 21 dust generation likely to occur or Zone 22 dust generation not likely to occur.Dust depositing on hot surface will cause explosion depending on the temperature and geometry of the surface. In most of the cases this can be avoided by good housekeeping. And also Ignition occurs only when the surface temperature reaches the minimum ignition temperature of the dust.Static electricity is also one of the major hazards in process and chemical industries. When a charged particle comes in contact with the opposite or dissimilar object there will be transfer of charge and will results in spark. Since the pulverize brook charged particle, when it comes in contact with dissimilar particle in transferring or free travel there will be transfer of charge which will generate spark. And the spark generated can cause ignition of the dust. Hence all the metal containers must be earthed so that the charge generated will expose away to the earth. And use non conducting materials are re commended in construction. Below diagram show difference between earthed and non-earthed theatre directornumberure 2a Hazards in non-earthed conductorFriction is also one of the ways that dust cloud can be ignited. That is when hot particles come in contact with mechanical equipment by rubbing or bear uponing against the equipment can ignite the dust cloud. This friction ignition depends upon the maximum velocity of the hot particle impacting against the hot surface. And hence use of such mechanical equipment should be avoided.And the early(a) possible chances of ignition of dust clouds can be through spontaneous combustion. So this type of burning occurs due to self-heating as a result of internal exothermic reaction which is followed by thermic runaway. If this heat inconvenience is unable escape will result in ignition. And also sufficient oxygen and dust concentration must be present for the thermal runaway ignition. Hence the safe way is to displace the oxygen is by quaggy ing.Inerting is a process by sending mucky substances to remove or prevent the explosive atmosphere formation. The main objective is to overhaul or to reduce the oxygen level below the lower flammability limit in order to avoid the catastrophic dust explosion, in some case combustion can also occur in very low oxygen level so in that case is safe to replace all the air with inert gases. Even sometimes explosive dust generated inside the vessel can be diluted into non explosive dust by passing certain inert dust e.g. limestone. When inerting theres chance of inert gases gets trapped inside the vessel, where personnels are accessible for confined space works, this will result in asphyxiation. Hence proper statutory rules must be followed in entry of confined space.Care should be taken when inert gases are sent into the distribution line. That is before passing the inert gases the impurities such as equivocal substance moisture etc. should be removed from the inert gases by means of filter. And flow of the inert gases must be maintained by the pressure monitoring and controlled. Flow chart for inerting process is shown belowInertingUse of inert dust as an inert mediumSuitable inert gas operable e.g.) N2, co2 etcPerforming oxygen limiting measurement at process temperature and pressureDesign dust inert systemEnsure the reliability of the monitoring systemInert gas cost when compared to other safety technique, are the cost found satisfactoryConsider basis of safety for design and operationAnd some the other available prevention techniques include installation of pressure sensor, alarm system in-case of overpressure, self-activating shutdown system in-cases of overpressure, Level indicator, correct operational procedures and Proper maintenance and inspection procedures.Explosion containment is used to withstand the explosion pressure rise and to prevent the rupture of the containment. The explosion containment usage is accepted when the release of the process m aterials is not acceptable. First maximum explosion pressure Pmax must be determined, since it is the crucial factor in explosion containment. Hence pressure insusceptible vessels are designed to withstand the maximum explosion pressure without any deformation or rupturing the vessel. And hence the stress induced by the maximum explosion overpressure should not exceed 50% of the yield strength of the weakest part.Explosion pressure nose candy resistant vessel is also designed to handle the maximum explosion pressure but deformation occurs to some extent. And the stress induced by the maximum explosion overpressure should not exceed 90% of the yield strength of the weakest part. synthetic flow chart for explosion containment is shown belowExplosion ContainmentMulti-volumeSingle volumeCan explosion be contained by knowing Pmax and plant design?Are the multiple volume is mechanically isolatedIs devotion of vessel acceptable?Use pressure shock resistant vesselUse pressure resistant vesselConsider basis of safety for design and operationCost valid when compared to other safety techniquesSuppression is a technique which identifies the starting point of explosion and extinguishes the growing get up. Normally suppressor is used whenever it is difficult to discharge the pressure and flame in a safe area. Normally it takes 40 90ms for an explosion to occur when the dust gets ignited. So now the explosion detector detects the pressure rise in the vessel and it is designed to set the alarm when it reaches the reference pressure rise and activates the suppressor so that it suppresses/extinguishes the growing fire ball inside the vessel. Suppressor can also be used in parallel with venting where sufficient venting area is not achieved. And also it is to noted that explosion detector should withstand to the vibration, shock and resistant against corrosion. Below figure shown is the normal working of suppressor in the vessel.Normally suppression can be used for a vess el volume up-to 1000m3. For vessel larger than 1000m3 explosion suppression can be used and the explosion suppressor must be within the vessel volume boundary.Fig 2b Suppressor workingIf a vessel is without suppressor and dust explosion occurs in a enclosed vessel then the pressure rise grow and attains destructible level which is shown below in graphical recordical record (line A). If a suppressor is installed and suppressor extinguished before the explosion then the maximum pressure rise will be reduced Pred within the maximum vessel design pressure, shown below in graph (line B). In order to achieve the above it also depends upon the suppressor location, suppressor discharge rate and also number of suppressor placed in the vessel.Graph 2a Pressure rise with suppressor and without suppressor at that place are many types of suppressors available such as hemispherical suppressor, High rate discharge suppressor are used. Normally high rate discharge are most widely used because for t heir high discharge rate to suppress the fire. In hemispherical suppressor usually liquids i.e. water is used as suppressant and can store upto 5 litres. And the initial velocity of hemispherical suppressor is 200m.s-1 and the discharge time is 10 30 ms. For high rate discharge suppressor the suppressant used can be liquid or dry powder. It can suppressant discharge time is within 10 msec and suppressant stored upto 40kg.And the suppressant materials used in order to supress the fire must quench the combustion. And some of the normally used suppressants are dry powder i.e. dry chemical and water.Flameless venting is done to vent the explosions without any happen of external flame. Flameless venting device consists of flame arrestor which quenches the flame that propagates outside from the vessel. The main principle is that the arrestor reduces the give the axe from flame below the ignition temperature by energy dissipation in the flame arrestor.3.Here in this bag filling facility , use of hazardous substance involved. Hence this operation must abide to control of substance hazardous to health Regulation 2002 (As Amended) (COSHH) to control the hazards to the human health.Here in this bag filling facility there is use of plastic powder which get filled and packed. In this plastic power has an additive known as Methylene dianiline. This plastic powder is a thermoplastic intended for use in injection of moulding machine.This methylene dianiline is a carcinogen which causes cancer when it is inhaled by the people tenanted in bag filling operation. So it is necessary to conduct control of substance hazardous to health risk assessment. And to evaluate the allowable vulnerability limits and the necessary measure to be taken plot of land handing the hazardous materials. of import steps to be followed to prevent the health hazards and to comply with COSHH are as followsi. set the riskii. Control measure implementationiii. Control the exposureiv. Continual improv ement and practice of the control measure implementedv. Monitoring the exposure level with the control measuresvi. Providing health monitoring check upvii. Prepare need plan and conduct emergency mock drillviii. Providing training and necessary information to the employeesSubstances or chemicals that are hazardous to personnel health will come under COSHH. Here methylene dianiline is used which is set as a potential carcinogen and hence the operation should comply with COSHH to control the health hazards and improve the operation.Determine the hazardThe first step is to identify the hazard whether the substance used in the process causes health hazard to employee engaged in work. Here it is set that Methylene Dianiline is a potential carcinogen. So operators engaged for bag filling, sealing and engaged in cleaning activities are at risk if exposed. So first we need to find the possible exposure points. From analysing the operation involved in bag filling facility. The possible re lease/exposure points are identify below,i. filling arms in bag filling station building it vibrates to prevent cloggingii. Opening the valve fast will cause sudden release of pressure.iii. root word sealing possible dust generation since the bag is left openediv. Cleaning the spilled dust near filling areav. Pneumatic conveyor possible leak point will cause dust dischargeHere it is identified that possibility of the substance route to affect operator health is through inhalation when released in air.And hazards of methylene dianiline and its chemical properties are taken from CHIP classification, Now CHIP convention gradually replaced by European CLP. And the hazard classification is taken from European regulation EC No 1271/2008 on Classification labelling and Packing (CLP) from Table 3.2 part3 of Annexure I to directive 67/548/EECIndex No planetary Chemical IdentificationEc NoCAS noClassificationLabellingConcentration Limit612-051-00-14,4Methylenedianiline202-974-4101-77-9Cr ac regurgitate 2R 45 Mutta.Cat,3 R 68T R39/23/24/25Xn R48/20/21/22R43N R51-53TNR45-39/23/24/25-43-48/20/21/22-68-51/53S53-45-61Table 3aClassification is taken from European regulation EC No 1271/2008 on Classification labelling and Packing (CLP) from Table 3.1 part3 of Annexure VI to directive 67/548/EECIndex NoInternational Chemical IdentificationEC NoCAS noClassificationLabelling bad Class and Category codesHazardous Statement CodesPictogram signal word codeHazardous Statement CodesSuppl. Hazardous Statement Codes612-051-00-14,4Methylenedianiline202-974-4101-77-9Carc 1BMuta 2STOT SE 1STOT RE 2Skin sens 1AquaticChronic 2H350H341H370**H373**H317H411GHS08GHS07GHS09DgrH350H341H370**H373**H317H411Table 3bWhere R Risk phase and H Hazard , Classification of levels of danger i.e. harmful, toxic, very toxic as per CHIP regulation. Here MDA is classified as potential carcinogen R 45 Cancer causing substance.deciding proper safe guarding measureSince here the plant is in designing stage so the possible release/exposure points, population exposed to the hazardous substance and route of entry are identified and necessary control measure are indentified below to implement from the designing stage. So COSHH essential uses out of the risk assessment information it chooses one of the methods for control measure shown below,Figure 3aThe factors used in identifying abstract controls measure are in below figure,Figure 3bSo the following steps are followed in identifying adequate control measure as mentioned in COSHH essentials Easy steps to control chemicalsi. Group the hazards identifiedii. Grouping the physical properties of the amount usediii. Asses the anticipated exposureiv. Now combine step 1 to 3 to form a generic assessmentGrouping the hazard, hazards are classified between A to E by R-Phase given in CHIP and H-Phase given in CLP. Below the table shows the classification of hazard group. In the below table units, mg/m3 milligrams per cubic meter and ppm parts per million. From below table methylene dialine classified under group E dust.Table 3cNow to determine the predictive exposure we must first classify the hazardous substance physical properties. Here in bag filling operation, hazardous substance is in dust form, since the plastic powders are granule will generate dust. So as per COSHH essential they have presented a table for identifying the determining(prenominal)s of the hazardous substance. That is the factor for deciding the physical properties for unassailable are dustiness and for the liquid is the volatility.And based upon the below shown table here methylene dianiline is identified as fine solid and light power and the corresponding determinant is identified as high.Table 3dAnd after identifying the determinant and amount used as per COSHH essential has identified four band of exposure potential and the table is shown below,Table 3eHere in bag filling and packing operation the main product is plastic powder which contains met hylene dianiline as an additive. So the quantities used which assumed to be in tonnes, the main aim of this plant is packing plastic powder. And the exposure predictor band here it is identified as EP 4. bump to decide which the control approach is adequate enough to control the situation of health hazard has to be identified from the range given which is used in COSHH essential. And table is shown belowTable 3fAnd based upon the above control approval table and exposure predictor table COSHH essential formed a table relating exposure predictor to control approach. And the table is shown below.Table 3gIn-order to choose the type of control measure recommended we have to relate the target airborne exposure to the exposure predictor band .Hence for this bag filling facility type-4 control is recommended because the concentration level of the dust is unknown.Sample COSHH Risk assessment quantity 1Step 2Step 3Step 4What are the hazardWhat will harm and who?What are you doingImprovements neededWhoWhenCheckBreathing in dust from filling stationSince the dust contains MDA might cause cancer and irritates the gas helmety systemDust maskGet cab and filtered air supplyConveyor to silo, to filling stationNobodyDust ExtractionCheck for leaks weeklyBagging plastic powderCharge handedStorage and dispatchForklift driverDust maskGet cab and filtered air supplyCleaning the plastic powder dust spillCharge handBrushingvacuity hose to dust extractionChanging dust filterCharge handUse of P3 respiratorContract out this workAlsoAction TakenAction neededExamination turn up COSHHSupervisionInstruction and trainingEmergency PlanHealth SurveillanceMonitoringReview exitRecommendationsHere to reduce the possible exposures to hazardous substance below are the following recommendations,i. Minimizing the generation of plastic dust such as designing conveying system in such a way to reduce the impact with hard surface to reduce the dust generation i.e. use of long track elbows.ii. Minim ising the release of plastic dust such as keep silo in good conditions i.e. avoid crack, proper maintenance etc., maintain the transfer equipment in good seal condition to avoid leaks.iii. Plastic dust can be captured and contained.iv. Create awareness among the employee about the hazards associated in handling hazardous substance and use of MSDS.v. Regular health surveillance must be conducted to employee exposed to risk.vi. Use of proper respiratory PPEs while handling with plastic powder. As per COSHH essential it is identified suitable PPEs for the selected group hazard. Table is shown below and it is identified as Assigned protection factor 200. This APF is in reference with BS 4275Table 3h4.Project expositionThe new bag filling line and silo is being constructed for a plastic manufacturer which is located in congested area which means the silo is located in between the nearby structures and objects but the whole plant is located in plain and partly terrain area. This facility involves transfer of plastic powder from the plant to silo for warehousing so that it can used to store plastic powder prior to the bagging and distribution. Here in the silo there is possible release of dust into the atmosphere due to overpressure or overfilling. Since the dust generated inside the silo is vented to atmosphere so it must meet to the current environment legislation in order to avoid air pollution. From Silo the plastic powder is sent to bag filling station. The bag filling station comprises a building in which there are four bag filling stations. Hence an environmental impact aspect must be undertaken before the commencement stage .Plant SketchSilo Air to bag f
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment